June 25, 2021

Ryan Sleeper: 3 Ways to Make Gorgeous Gantt Charts in Tableau

"Traditional Gantt charts display a mark at a start date and size the mark by duration, showing a visual connection between a starting point and an end point. The fact that Tableau has a mark type of “Gantt Bar” that can be sized by any value, whether it’s a duration or another type of value completely, unlocks some additional flexibility. The Gantt Bar mark in Tableau can be used to create waterfall charts, leapfrog charts, ranged dot plots, bar-in-bar charts – or for their traditional use – project planning."

To read Ryan Sleeper's full blog post, click here.